Arriva 752Installation guideModels: RHFE752ETRN/RHFE752ETRL
10 | Arriva 752 Installation Guide: 12218-A 01-12Arriva ue componentsDirect A flue kitCode = R2731For use in walls 115-240 mm thick—typically w
Arriva 752 Installation Guide: 12218-A 01-12 | 11Vertical terminalCode = ESROOFCOWLRoof cowl and connecting pipe (960 mm installed) for termina
12 | Arriva 752 Installation Guide: 12218-A 01-12Flue transitionThe flue transition provides a connection between the flue system and the heater’s
Arriva 752 Installation Guide: 12218-A 01-12 | 13Arriva 752 installationIsolate the electrical supply before removing any panels.Installation ov
14 | Arriva 752 Installation Guide: 12218-A 01-12Installing the burn media1. Remove combustion chamber glassBefore the burn media can be in
Arriva 752 Installation Guide: 12218-A 01-12 | 15CommissioningThe gas pressures of the appliance are factory preset for direct flue installations
16 | Arriva 752 Installation Guide: 12218-A 01-12Panel installationGlass panelsAlways wear gloves and safety glasses when handling glass.Install
Arriva 752 Installation Guide: 12218-A 01-12 | 17Flame patternIt may take approximately two hours of operation for the logs to achieve their ful
18 | Arriva 752 Installation Guide: 12218-A 01-12Installation checklistComplete the installation checklist in the customer operation guide, and
Arriva 752 Installation Guide: 12218-A 01-12 | 19Wiring diagram (12258-A)4 32 121121110987654321ER3 16 5 4 3 2 16 5Wiring DiagramRH
Appliance must be installed with a Rinnai approved flue system.This appliance shall be installed in accordance with: - Manufacturer’s installation inst
Rinnai.co.nz Experience our innovation 0800 746 624https://www.youtube.com/rinnainz
cnt:Specification 4Clearances 5Location 6Gas connection 7Flueing options 8Flueing guidelines 9Arriva flue compo
4 | Arriva 752 Installation Guide: 12218-A 01-12SpecicationSpecification summaryInput = 8-31.5 MJ/hOutput = 1.8-7.0* kWEfficiency = 79-89%
Arriva 752 Installation Guide: 12218-A 01-12 | 5ClearancesThe clearances listed below are minimum clearances unless otherwise stated. Clearances
6 | Arriva 752 Installation Guide: 12218-A 01-12Location The main points governing location are flueing and warm air distribution. The Rinnai Arr
Arriva 752 Installation Guide: 12218-A 01-12 | 7Gas connectionGas pipe sizing must consider the gas input to this appliance, as well as other ga
8 | Arriva 752 Installation Guide: 12218-A 01-12Flueing optionsFlueing notesFor all installations an Arriva flue system MUST BE used. Detailed flu
Arriva 752 Installation Guide: 12218-A 01-12 | 9Flueing guidelinesClearance to combustibles• Flue transition (p. 12) - 5 mm• Elbow component o