Rinnai Arriva 752 Guia de Instalação

Consulte online ou descarregue Guia de Instalação para Lareiras Rinnai Arriva 752. Rinnai Arriva 752 Installation guide Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - Arriva 752

Arriva 752Installation guideModels: RHFE752ETRN/RHFE752ETRL

Página 2 - Important:

10 | Arriva 752 Installation Guide: 12218-A 01-12Arriva ue componentsDirect A flue kitCode = R2731For use in walls 115-240 mm thick—typically w

Página 3

Arriva 752 Installation Guide: 12218-A 01-12 | 11Vertical terminalCode = ESROOFCOWLRoof cowl and connecting pipe (960 mm installed) for termina

Página 4 - Specication

12 | Arriva 752 Installation Guide: 12218-A 01-12Flue transitionThe flue transition provides a connection between the flue system and the heater’s

Página 5 - Clearances

Arriva 752 Installation Guide: 12218-A 01-12 | 13Arriva 752 installationIsolate the electrical supply before removing any panels.Installation ov

Página 6 - Left and right wheels

14 | Arriva 752 Installation Guide: 12218-A 01-12Installing the burn media1. Remove combustion chamber glassBefore the burn media can be in

Página 7 - Rear of

Arriva 752 Installation Guide: 12218-A 01-12 | 15CommissioningThe gas pressures of the appliance are factory preset for direct flue installations

Página 8 - Flueing notes

16 | Arriva 752 Installation Guide: 12218-A 01-12Panel installationGlass panelsAlways wear gloves and safety glasses when handling glass.Install

Página 9 - Flueing guidelines

Arriva 752 Installation Guide: 12218-A 01-12 | 17Flame patternIt may take approximately two hours of operation for the logs to achieve their ful

Página 10 - Arriva ue components

18 | Arriva 752 Installation Guide: 12218-A 01-12Installation checklistComplete the installation checklist in the customer operation guide, and

Página 11 - External wall plate

Arriva 752 Installation Guide: 12218-A 01-12 | 19Wiring diagram (12258-A)4 32 121121110987654321ER3 16 5 4 3 2 16 5Wiring DiagramRH

Página 12 - Flue transition

Appliance must be installed with a Rinnai approved flue system.This appliance shall be installed in accordance with: - Manufacturer’s installation inst

Página 13 - Arriva 752 installation

Rinnai.co.nz Experience our innovation 0800 746 624https://www.youtube.com/rinnainz

Página 14 - Installing the burn media

cnt:Specification 4Clearances 5Location 6Gas connection 7Flueing options 8Flueing guidelines 9Arriva flue compo

Página 15 - Commissioning sheet position

4 | Arriva 752 Installation Guide: 12218-A 01-12SpecicationSpecification summaryInput = 8-31.5 MJ/hOutput = 1.8-7.0* kWEfficiency = 79-89%

Página 16 - Panel installation

Arriva 752 Installation Guide: 12218-A 01-12 | 5ClearancesThe clearances listed below are minimum clearances unless otherwise stated. Clearances

Página 17 - Flame pattern

6 | Arriva 752 Installation Guide: 12218-A 01-12Location The main points governing location are flueing and warm air distribution. The Rinnai Arr

Página 18 - Installation checklist

Arriva 752 Installation Guide: 12218-A 01-12 | 7Gas connectionGas pipe sizing must consider the gas input to this appliance, as well as other ga

Página 19 - Wiring diagram (12258-A)

8 | Arriva 752 Installation Guide: 12218-A 01-12Flueing optionsFlueing notesFor all installations an Arriva flue system MUST BE used. Detailed flu

Página 20 - Experience our innovation

Arriva 752 Installation Guide: 12218-A 01-12 | 9Flueing guidelinesClearance to combustibles• Flue transition (p. 12) - 5 mm• Elbow component o

Comentários a estes Manuais

Sem comentários