Rinnai Elevate Manual de Instalação Página 37

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 56
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 36
Rinnai Australia 34 Sapphire Operation & Installation Manual
HEATER ENGINE INSTALLATION - ZERO CLEARANCE
Step 3. Fitting Zero Clearance Box Into Cavity
Slide zero clearance box assembly into the cavity, ensuring
the gas and electricity supplies are accessible.
Secure the zero clearance into the cavity with
appropriate fasteners (not supplied).
Install the Rinnai rigid flue system components in
accordance with the ‘Flueing Installation Manual For Rinnai
Flamefire Heaters’ that is provided with the flue kit.
Step 4. Unpack The Heater Engine
The heater engine is supplied in one carton, check to
ensure you have all contents as listed on “BEFORE YOU
START” on page 2 at the start of this manual before
proceeding.
Remove carton by removing the straps and carefully lifting
the carton off the appliance. Remove all packaging
materials and check all components for damage. If ANY
damage is evident DO NOT install or operate this appliance.
Contact your supplier for advice.
Before installing the heater, check it is labelled for the
correct gas type, (refer to the gas type label on the top body
panel of the heater). Refer to the local gas authority for
confirmation of gas type if you are in doubt.
Step 5. Preparing Heater Engine
Drill 4 x Ø 3.2mm holes in the pre pressed location dimples
in the top panel of the heater. Then attach the flue guide
rails using these holes with four screws (supplied).
When preparing a cavity / frame for a zero
clearance installation the total cavity depth
MUST also include the thickness of the
external cladding , as the zero clearance
box MUST BE installed flush with the cladding
surface, failure to do this will cause
misalignment of the flueing.
Ensure there are no wall studs, noggins,
ceiling joists, wiring or other obstruction
within the wall and or ceiling cavity where the
flue is proposed to penetrate.
Retain the card board carton for use in the
“Positioning the Heater Engine” on page 35.
Flue guide rails and pop rivets supplied with
Zero Clearance kit, part number R2340.
Before proceeding any further with the heater
engine installation ensure the cladding for the
front of the enclosure has been fitted
.
I
J
K
L
Drill
4 x Ø 3.2mm
Holes
N
M
CAUTION
I
J
K
IMPORTANT
HINT
L
IMPORTANT
M
Vista de página 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 55 56

Comentários a estes Manuais

Sem comentários