Rinnai Australia - 15 - Rinnai Luminaire® Outdoor Gas Fire - Operation and Installation Manual
Steel framing options are available for the one sided and two sided see-through units. For ease of
installation Rinnai provide the durable steel frame as a kitset.
Prepare framing dimensions
Construct framing to specific installation dimensions shown.
To enhance the durability of the framing we suggest the frame is mounted on a paved slab 250 mm
(above unpaved ground) and 150 mm (above paved ground). We also recommend having a 25 mm
air gap to stop LPG from pooling and to allow moisture to drain easily from the enclosure.
The minimum clearances to combustible framing materials are:
For the Open See-Through Cabinet you will need to observe these clearances on both faces.
Non-combustible cladding and frame materials are required when dimension
B = 1180 mm.
Install body/burner assembly into frame
When purchasing a cabinet option the body and
burner come pre-assembled. simply unpack, fit and
secure assembly into the frame using bottom fascia
brackets.
For the see-through unit you will need to ensure the
control knob is facing the correct way for easy
operation.
Drill hole in bottom bracket and fit screw to secure
assembly.
Above Side Below Behind
500 mm 25 mm 0 mm 30 mm (One sided cabinet)
Non Combustible Combustible
A = 555 mm
B = 1180 mm*
C (two sided) = 470 mm**
C (one sided) = 500 mm**
D = 500 mm ***
A = 555 mm
B = 1225 mm*
C (two sided) = 470 mm**
C (one sided) = 500 mm**
D = 500 mm ***
* Includes 25 mm side clearances
** Includes cladding (for one sided unit 500 mm
dimension measures front cladding only)
*** If due to design this dimension required to be less
than 500 mm, you will need an additional steel lintel.
This can be ordered as a spare part from Rinnai.
slab used to elevate enclosure above ground to
enhance durability of framing
25 mm air gap to stop LPG pooling at base and
also to allow moisture to drain easily
A
B
D
C
metal lintel
cladding